Five points for quality control of plastic cap mold manufacturing.

Update:14-05-2020
Summary:1.Plastic cap molds should have product data management, process data management, and drawing and document management, w...

1.Plastic cap molds should have product data management, process data management, and drawing and document management, which can ensure the comprehensiveness of the files and the consistency of the drawing versions; so that the drawings can achieve effective sharing and effective query and utilization. A complete computer database for document management can be established, and a large number of design drawings accumulated in the design department, scattered, and previously scattered and isolated information can be collected and used together to prevent the 2d and 3d confusion due to design drawings, original, design changes, The maintenance version is chaotic, the 3D model and the 2D drawing data are inconsistent, and the 2D drawing design is not standardized and chaotic, causing problems that are not easy to be found and corrected in time, causing the Plastic cap mold to be modified and reworked, or even scrapped, increasing the manufacturing cost of Plastic cap mold , Lengthen the production cycle of mold manufacturing and affect the progress.

2.Formulate a complete set of Plastic capmold production management system to realize the computer information management system of product data management, process data management, plan management and schedule management of molds in the production management process, including the formulation of mold production plans and mold design , Process formulation, workshop task assignment and product inspection, warehouse management, etc., so that Plastic capmold manufacturing and related auxiliary information from plan formulation to completion and delivery can achieve a full range of tracking management.
 


3. Organize and integrate the information of planning, design, processing technology, workshop production situation, human resources, etc. organically, so as to effectively coordinate planning and production, and effectively ensure the quality of Plastic cap molds and deliver on time.
 


4. By effectively controlling the issuance of work tickets in the workshop, effectively managing the scrap of the cutter; through accurate mold structure design, efficient mold part processing and accurate spare parts detection, Plastic cap molds will be effectively reduced due to design changes and maintenance The additional cost brought, so as to obtain the actual cost of each set of molds, and effectively control the quality of the molds.
 


5. Maintain the consistency and integrity of Plastic cap mold drawings, processing technology, and physical data: through effective, meticulous, and strict testing methods, ensure the consistency and integrity of mold drawings, processing technology, and physical data .